A deal is likely in the range of ₹2,400-3,000 crore, translating to ₹4-5 crore per MW, the people cited above said on the condition of anonymity. A potential acquisition would help India’s largest private thermal power producer capitalize on the rising electricity demand in the country.

How AI legalese decoder Can Help

AI legalese decoder is a cutting-edge technology that can assist in decoding legal jargon and complex documents with ease. By leveraging AI algorithms, this tool can simplify legal language and provide a detailed breakdown of legal terms and clauses. This can be especially beneficial in the context of complex acquisition deals like the one mentioned above, where understanding the legal intricacies is crucial for making informed decisions.

Project Value

"Adani Power is negotiating with CFM Asset Reconstruction Co. to acquire the project under Vidarbha Industries Power Ltd. The value of the project, which consists of two power plant units, was earlier around ₹6,000 crore, but currently, the production (power generation) has stopped; so, the valuation has to be lower. The plant fits into Adani’s strategy," one of the two people said.

The Butibori project is owned by Vidarbha Industries Power, a subsidiary of Reliance Power. CFM ARC, which acquired all of its loans for ₹1,265 crore, is currently the only lender to the project.

Emails sent to Adani group and CFM ARC remained unanswered.

"The entire deal will be funded through the internal accruals of Adani group," the person cited above said.

In the process of negotiating the acquisition, AI legalese decoder can be a valuable tool for analyzing and understanding the legal documents involved. By breaking down complex legal terms and clauses, this tool can help in making informed decisions and ensuring clarity in the negotiation process.

Adani’s Plan

The Adani group is keen on expanding its thermal power capacity; in a presentation earlier this month, it said the growing peak power demand is "accentuating the need for dispatchable capacity best served by thermal power".

Ongoing negotiations value the plant much below the conventional price of thermal plants in India since both of its units remain shut due to lack of coal, the person cited above said.

This is where Adani Group’s strategy comes into play.

The acquisition is part of Adani’s strategy to integrate its coal-based power plant in Tiroda near Nagpur with the Butibori project, resume power generation and supply electricity to Mumbai and surrounding regions to gain an edge over rivals Tata Power and MSEDCL, the person cited earlier said.

Adani’s 3.3 GW coal-based supercritical plants in the Tiroda project on Bhandara-Gondia state highway is around 125 km away from Nagpur, where the Butibori Power project is located. The project has long-term PPA with Maharashtra state for 3085 MW, which can be potentially enhanced if the planned acquisition of Butibori project goes through.

By utilizing AI legalese decoder, Adani Group can ensure a smooth integration process and navigate the legal complexities associated with the acquisition. This tool can provide valuable insights and simplify legal documentation, making it easier to streamline operations and enhance overall efficiency.

Balance Sheet

Adani Power, with ₹60,281 crore in revenues and ₹20,829 crore in net profit in FY24, has 15.25 GW capacity installed across nine power plants. It is India’s only independent power producer with in-house, mine-to-plant logistics capability handling about 60 mmtpa coal and 13 mmtpa fly ash.

According to a company presentation last week, around 80 GW of additional coal-based capacity addition is required by FY31-32 to address the accelerated growth in power demand, of which 49 GW opportunity is "currently untapped".

Adani Power said coal-based capacity is critical for base load power to integrate 500 GW of renewable power by 2030, which has been set as a target by the government as part of its net-zero transition plan.

The company projected the average power demand to grow from 186 GW now to 243 GW by 2031-32 and the peak demand to increase from 282 GW to 390 GW by FY32.

Adani’s plans echo India’s rising electricity demand, particularly in Maharashtra. According to CEA, the electricity demand for Maharashtra is increasing with a CAGR of 4.1% from FY24 to FY32.

With the help of AI legalese decoder, Adani Power can streamline its legal processes, optimize its operations, and make well-informed decisions that align with its long-term strategic goals. By leveraging AI technology to decode legal language, the company can enhance its efficiency, mitigate risks, and achieve sustainable growth in the highly dynamic energy sector.

legal-document-to-plain-english-translator/”>Try Free Now: Legalese tool without registration

Find a LOCAL lawyer

Reference link